How do I prepare my house for demolition?
Planning guidance from TrueNorth Demolition. Project conditions and current authority requirements should be confirmed before work.
- preparation
- teardown
- homeowners

To prepare a house for demolition, clear out everything you want to keep, arrange utility disconnections, get a Designated Substance Survey and apply for the City's demolition permit. Then protect the trees you are keeping and let your neighbours know the dates.
The order matters because some steps depend on others. Follow the City's current application checklist while coordinating utility providers; demolition must wait for both the required approvals and completed disconnections.
Clear the house
Remove furniture, personal items and anything you want to salvage, such as light fixtures, doors or hardwood. Items left behind become demolition debris. Things like paint cans, propane tanks and batteries need to go to a York Region hazardous waste depot, not into the demolition load.
Disconnect the utilities
Contact each provider well ahead, since bookings can take time:
- Enbridge Gas to disconnect and remove the gas meter
- Alectra to disconnect electricity
- The City to arrange water and sewer capping
- Phone, cable and internet providers to remove their lines
Survey and permit
Arrange a professional assessment of suspect materials. Where OHSA applies, section 30 requires the owner to identify designated substances and share the information with prospective contractors. If asbestos is found, schedule abatement under O. Reg. 278/05. Prepare the demolition application using the City's current checklist and coordinate utility appointments alongside it. Read more in what the City requires before demolishing a house.
Trees, neighbours and insurance
Arrange tree protection hoarding if you have protected trees, and get City permits for any that must be removed. Tell your neighbours the dates. Call your home insurer, because coverage on a house that is about to be demolished changes, and your builder's insurance may take over.
Paperwork to keep
Keep copies of the survey, abatement clearance, every utility confirmation, tree permits and the demolition permit together. Your builder, your insurer and the City may each ask for some of them later, and having them in one place saves time when the building permit stage arrives.
A simple timeline
Every project is different, but the order usually looks like this:
- Book the site visit and get a written scope
- Arrange the Designated Substance Survey
- Request utility disconnections
- Schedule any asbestos abatement
- Apply for tree permits and install hoarding
- Apply for the demolition permit
- Empty the house and notify neighbours
Common delays and how to avoid them
Utility appointments, incomplete application information and late discovery of hazardous materials can affect the schedule. Start provider coordination and the required survey early, and check the City's current application requirements rather than assuming one utility-letter sequence. Protected trees can also require review and hoarding before work starts. These steps reduce avoidable uncertainty without guaranteeing a completion date.
Keeping everything in one folder, with copies of each confirmation, makes the permit application quicker and gives your contractor what they need.
What this business does about it
We give you a checklist at the site visit showing which of these steps apply to your lot and in what order. Once they are done, our crew handles the residential demolition, and any leftover contents or yard material can go with junk and debris removal. Request a free estimate to get started.
Frequently asked questions
- How early should I call the utilities?
- Contact providers early and check the City?s current application checklist. Provider coordination can run alongside the application; demolition waits for the required approvals and confirmed disconnections.
- Can I salvage materials before demolition?
- Yes. Remove anything you want before the crew arrives. Many owners keep fixtures, doors, brick or hardwood.
- What if I forget to clear something?
- Items left in the house usually become part of the debris. Walk through the house one last time before demolition day.
- Should I cancel my home insurance?
- Talk to your insurer before demolition. Coverage needs change once the house is empty and scheduled to come down.
Confirm requirements for your property
Permit, utility and hazardous-material questions need project-specific review. Use these official starting points and discuss the scope with qualified professionals.
- Richmond Hill building and demolition permits
- Ontario: owner responsibilities and designated substances
- Ontario: asbestos in the workplace